ITAC Assessment: MS0323
ITAC logo
ITAC Assessment: MS0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Air Conditioning Equipment
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 100,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,809 6,114,600
kWh
Electricity Demand $253,267 13,398
kW-mo/yr
Electricity Fees $5,923 -
Natural Gas $146,903 11,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,181

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,680 $26,178 $8,234
183,961
kWh
$4,259
-
kW-mo/yr
$187
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,013 $266 $3,954
88,351
kWh
- $59
03 2.4221: Install compressor air intakes in coolest locations $2,739 $3,030 $1,448
32,340
kWh
$1,251
-
kW-mo/yr
$40
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,492 $8,771 $1,485
33,185
kWh
$970
-
kW-mo/yr
$37
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $257 $450 $133
2,980
kWh
$120
-
kW-mo/yr
$4
TOTAL RECOMMENDED $22,181 $38,695 $15,254
340,817
kWh
$6,600
-
kW-mo/yr
$327
TOTAL IMPLEMENTED $22,181 $38,695 $15,254
340,817
kWh
$6,600
-
kW-mo/yr
$327
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs