Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0426 #03 Y:2013 Use power during off-peak periods $14,106 $8,320
BD0426 #02 Y:2013 Use radiant heater for spot heating $6,235 $22,050
BD0426 #01 Y:2013 Adjust / maintain fork lift trucks for most efficient operation $12,183 $42,000
BD0412 #07 Y:2012 Recharge batteries on during off-peak demand periods $798 $40
BD0412 #06 Y:2012 Install compressor air intakes in coolest locations $2,988 $2,000
BD0412 #05 Y:2012 Use synthetic lubricant $4,093 $1,200
BD0412 #04 Y:2012 Reduce the pressure of compressed air to the minimum required $4,859 $20
BD0412 #03 Y:2012 Install occupancy sensors $4,980 $1,050
BD0412 #02 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $4,041 $6,000
BD0412 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $12,670 $30,287
BD0408 #06 Y:2012 Recover and reuse waste material $975 $400
BD0408 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $154 $20
BD0408 #04 Y:2012 Recover waste heat from equipment $1,622 $4,000
BD0408 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $4,611 $50
BD0408 #02 Y:2012 Install compressor air intakes in coolest locations $15,937 $1,500
BD0408 #01 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $23,702 $57,000
BD0392 #12 Y:2011 Begin a practice of predictive / preventative maintenance $12,800 $1,600
BD0392 #11 Y:2011 Reschedule breaks to allow for continuous production $67,284 $10
BD0392 #10 Y:2011 Minimize water usage $1,525 $1,800
BD0392 #09 Y:2011 Utilize higher efficiency lamps and/or ballasts $241 $250