ITAC Assessment: BD0412
ITAC logo
ITAC Assessment: BD0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive vapor canisters
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 80,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,200 4,829,090
kWh
Electricity Demand $54,528 9,730
kW-mo/yr
Electricity Fees $1,420 -
Natural Gas $10,900 1,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,670 $30,287 $10,957
190,883
kWh
$1,713
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,041 $6,000 $3,494
60,873
kWh
$547
-
kW-mo/yr
03 2.7135: Install occupancy sensors $4,980 $1,050 $4,451
77,538
kWh
$529
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,859 $20 $4,202
73,205
kWh
$657
-
kW-mo/yr
05 2.4314: Use synthetic lubricant $4,093 $1,200 $3,540
61,672
kWh
$553
-
kW-mo/yr
06 2.4221: Install compressor air intakes in coolest locations $2,988 $2,000 $2,584
45,019
kWh
$404
-
kW-mo/yr
07 2.3132: Recharge batteries on during off-peak demand periods $798 $40 - $798
-
kW-mo/yr
TOTAL RECOMMENDED $34,429 $40,597 $29,228
509,190
kWh
$5,201
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs