ITAC Assessment: AT0008
ITAC logo
ITAC Assessment: AT0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BOYS' PANTS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,040
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,012 293,962
kWh
Fuel Oil #4 $18,123 3,024
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,812 $150 - $1,812
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $128 $222 - $128
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $251 $173 $251
3,810
kWh
-
04 2.7226: Use computer programs to optimize hvac performance $2,560 $1,050 $2,560
39,273
kWh
-
TOTAL RECOMMENDED $4,751 $1,595 $2,811
43,083
kWh
$1,940
-
MMBtu
TOTAL IMPLEMENTED $1,812 $150 - $1,812
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs