Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Storage battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0331 #03 Y:2022 Meter recycled water (to reduce sewer charges) $91,773 $9,040
MZ0331 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $18,037 $46,350
MZ0331 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $23,162 $25,757
UL2212 #05 Y:2022 Use waste heat from hot flue gases to preheat $7,902 $63,000
UL2212 #04 Y:2022 Use solar heat to make electricty $34,406 $237,031
UL2212 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $2,936 $19,500
UL2212 #02 Y:2022 Install occupancy sensors $1,208 $2,171
UL2212 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $12,840 $16,294
UF0575 #07 Y:2022 Level one – add communication using iiot devices to existing control system to modify operations $200,000 -
UF0575 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,831 $290
UF0575 #05 Y:2022 Eliminate or reduce compressed air usage $3,361 -
UF0575 #04 Y:2022 Lower light fixtures in high ceiling areas $5,193 $12,000
UF0575 #03 Y:2022 Use demand controller or load shedder $59,112 $64,054
UF0575 #02 Y:2022 Purchase gas directly from a contract gas supplier $175,432 -
UF0575 #01 Y:2022 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $320,724 $1,068,750
UD1020 #08 Y:2020 Turn off equipment when not in use $832 -
UD1020 #07 Y:2020 Turn off equipment when not in use $901 -
UD1020 #06 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $5,337 $22,400
UD1020 #05 Y:2020 Install motor voltage controller on lightly loaded motors $1,639 $6,550
UD1020 #04 Y:2020 Install motor voltage controller on lightly loaded motors $5,584 $27,600