Assessment Year | 2022 |
---|---|
Principal Product | lead acid batteries |
NAICS | 335911: Storage Battery Manufacturing |
SIC | 3691: Storage Batteries |
Sales Range | $100 M to 500M |
# of Employees | 495 |
Plant Area |
504,400
ft2
|
Annual Production | 63,876,869
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,387,309 | 54,865,902 |
kWh
|
$0.044 | |
Electricity Demand | $1,062,735 | 101,312 |
kW-mo/yr
|
$10.49 | |
Natural Gas | $331,584 | 177,721 |
MMBtu
|
$1.87 | |
Waste Disposal Costs | |||||
Water Usage | $173,288 | 43,433 |
Tgal
|
$3.99 | |
Water Disposal | $310,645 | 43,427 |
Tgal
|
$7.15 | |
TOTAL YEARLY COSTS | $4,265,561 | ||||
RECOMMENDED SAVINGS* | $759,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $170,570 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,162 | $25,757 |
$16,274
378,841
kWh
|
$6,888
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,037 | $46,350 |
$7,878
183,217
kWh
|
$5,209
-
kW-mo/yr
|
- | $4,950 | |
03 | 3.4116: Meter recycled water (to reduce sewer charges) | $91,773 | $9,040 | - | - |
$91,773
-
Tgal
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $5,985 | $29,286 |
$2,373
55,195
kWh
|
$3,612
-
kW-mo/yr
|
- | - | |
05 | 2.2622: Replace existing chiller with high efficiency model | $402,938 | $1,820,000 |
$263,527
6,128,535
kWh
|
$139,411
-
kW-mo/yr
|
- | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $31,613 | $98,280 |
$22,213
516,584
kWh
|
$9,400
-
kW-mo/yr
|
- | - | |
07 | 2.7273: Install desiccant humidity control system | $76,144 | $423,000 |
$47,756
1,110,595
kWh
|
$28,388
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $110,196 | $55,220 |
$110,196
2,562,689
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $759,848 | $2,506,933 |
$470,217
10,935,656
kWh
|
$192,908
-
kW-mo/yr
|
$91,773
-
Tgal
|
$4,950 | ||
TOTAL IMPLEMENTED | $170,570 | $208,713 |
$48,738
1,133,837
kWh
|
$25,109
-
kW-mo/yr
|
$91,773
-
Tgal
|
$4,950 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs