| Assessment Year | 1982 |
|---|---|
| Principal Product | SUTURES |
| NAICS |
n/a
|
| SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
| Sales Range | $100 M to 500M |
| # of Employees | 400 |
| Plant Area |
n/a
|
| Annual Production | 551,424,000
thousand feet
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $414,628 | 8,735,053 |
kWh
|
$0.047 |
| Natural Gas | $126,475 | 37,521 |
MMBtu
|
$3.37 |
| Fuel Oil #2 | $21,525 | 3,150 |
MMBtu
|
$6.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,302 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $18,635 | $5,100 |
$18,635
392,438
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,685 | $1,012 |
$4,685
98,769
kWh
|
- | - | |
| 03 | 2.7226: Use computer programs to optimize hvac performance | $12,800 | $27,000 |
$12,800
269,343
kWh
|
- | - | |
| 04 | 2.3191: Use demand controller or load shedder | $5,515 | - |
$5,515
-
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,467 | $1,155 |
$1,467
30,774
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,207 | - |
$1,207
25,498
kWh
|
- | - | |
| 07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $628 | $3,500 | - |
$512
-
MMBtu
|
$116
-
MMBtu
|
|
| TOTAL RECOMMENDED | $44,937 | $37,767 |
$44,309
816,822
kWh
|
$512
-
MMBtu
|
$116
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,302 | $4,655 |
$2,674
56,272
kWh
|
$512
-
MMBtu
|
$116
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs