ITAC Assessment: GT0138
ITAC logo
ITAC Assessment: GT0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SUTURES
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area
n/a
Annual Production 551,424,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $414,628 8,735,053
kWh
Natural Gas $126,475 37,521
MMBtu
Fuel Oil #2 $21,525 3,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,302

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7111: Reduce illumination to minimum necessary levels $18,635 $5,100 $18,635
392,438
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,685 $1,012 $4,685
98,769
kWh
- -
03 2.7226: Use computer programs to optimize hvac performance $12,800 $27,000 $12,800
269,343
kWh
- -
04 2.3191: Use demand controller or load shedder $5,515 - $5,515
-
kWh
- -
05 2.4133: Use most efficient type of electric motors $1,467 $1,155 $1,467
30,774
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $1,207 - $1,207
25,498
kWh
- -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $628 $3,500 - $512
-
MMBtu
$116
-
MMBtu
TOTAL RECOMMENDED $44,937 $37,767 $44,309
816,822
kWh
$512
-
MMBtu
$116
-
MMBtu
TOTAL IMPLEMENTED $3,302 $4,655 $2,674
56,272
kWh
$512
-
MMBtu
$116
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs