ITAC Assessment: UL2212
ITAC logo
ITAC Assessment: UL2212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $100
M
to 500
M
# of Employees 448
Plant Area 252,000
ft2
Annual Production 821,461
units
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,249,108 48,992,000
kWh
Electricity Demand $1,745,632 92,266
kW-mo/yr
Electricity Fees $340,819 -
Natural Gas $241,443 76,683
MMBtu
TOTAL YEARLY COSTS $3,577,002
RECOMMENDED SAVINGS* $59,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,840 $16,294 $5,449
217,949
kWh
$7,391
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,208 $2,171 $1,208
48,307
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,936 $19,500 $2,936
117,443
kWh
- -
04 2.9114: Use solar heat to make electricty $34,406 $237,031 $14,411
576,425
kWh
$19,995
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $7,902 $63,000 - - $7,902
-
MMBtu
TOTAL RECOMMENDED $59,292 $337,996 $24,004
960,124
kWh
$27,386
-
kW-mo/yr
$7,902
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs