Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0321 #06 Y:2006 Install compressor air intakes in coolest locations $111 $150
BD0321 #05 Y:2006 Reduce the pressure of compressed air to the minimum required $225 -
BD0321 #04 Y:2006 Install occupancy sensors $534 $525
BD0321 #03 Y:2006 Utilize daylight whenever possible in lieu of artificial light $2,096 $10,000
BD0321 #02 Y:2006 Install vinyl strip / high speed / air curtain doors $5,141 $2,400
BD0321 #01 Y:2006 Install vinyl strip / high speed / air curtain doors $32,663 $120,000
IC0122 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $268 $816
IC0122 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $490 -
IC0122 #05 Y:2006 Install occupancy sensors $1,480 $1,791
IC0122 #04 Y:2006 Install timers and/or thermostats $2,700 -
IC0122 #03 Y:2006 Eliminate or reduce compressed air usage $3,130 $21,000
IC0122 #02 Y:2006 Replace boiler $10,973 $46,865
IC0122 #01 Y:2006 Use most efficient type of electric motors $14,489 $58,358
OK0736 #06 Y:2006 Use photocell controls $3,268 $225
OK0736 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $5,322 $1,267
OK0736 #04 Y:2006 Meter recycled water (to reduce sewer charges) $8,438 $765
OK0736 #03 Y:2006 Install / repair insulation on steam lines $29,250 $20,340
OK0736 #02 Y:2006 Use heat in flue gases to preheat products or materials $447,023 $299,500
OK0736 #01 Y:2006 Insulate bare equipment $224,746 $154,440
WV0343 #06 Y:2006 Develop a repair/replace policy $4,236 $635