ITAC Assessment: BD0321
ITAC logo
ITAC Assessment: BD0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Generator Sets
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 100,000
ft2
Annual Production 1,200
units
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,918 1,454,074
kWh
Electricity Demand $7,440 3,162
kW-mo/yr
Electricity Fees $6,305 -
Natural Gas $54,054 4,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,888

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $32,663 $120,000 - - $10,163
-
MMBtu
$22,500 -
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,141 $2,400 - - $5,141
-
MMBtu
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,096 $10,000 $1,310
28,476
kWh
$710
-
kW-mo/yr
- $22 $54
04 2.7135: Install occupancy sensors $534 $525 $415
79,289
kWh
$119
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $225 - $207
4,089
kWh
$18
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $111 $150 $102
2,011
kWh
$9
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $40,770 $133,075 $2,034
113,865
kWh
$856
-
kW-mo/yr
$15,304
-
MMBtu
$22,522 $54
TOTAL IMPLEMENTED $32,888 $120,000 $207
4,089
kWh
$18
-
kW-mo/yr
$10,163
-
MMBtu
$22,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs