Assessment Year | 2007 |
---|---|
Principal Product | Generator Sets |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
100,000
ft2
|
Annual Production | 1,200
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,918 | 1,454,074 |
kWh
|
$0.049 |
Electricity Demand | $7,440 | 3,162 |
kW-mo/yr
|
$2.35 |
Electricity Fees | $6,305 | - |
|
- |
Natural Gas | $54,054 | 4,616 |
MMBtu
|
$11.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,888 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $32,663 | $120,000 | - | - |
$10,163
-
MMBtu
|
$22,500 | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,141 | $2,400 | - | - |
$5,141
-
MMBtu
|
- | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,096 | $10,000 |
$1,310
28,476
kWh
|
$710
-
kW-mo/yr
|
- | $22 | $54 | |
04 | 2.7135: Install occupancy sensors | $534 | $525 |
$415
79,289
kWh
|
$119
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $225 | - |
$207
4,089
kWh
|
$18
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $111 | $150 |
$102
2,011
kWh
|
$9
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $40,770 | $133,075 |
$2,034
113,865
kWh
|
$856
-
kW-mo/yr
|
$15,304
-
MMBtu
|
$22,522 | $54 | ||
TOTAL IMPLEMENTED | $32,888 | $120,000 |
$207
4,089
kWh
|
$18
-
kW-mo/yr
|
$10,163
-
MMBtu
|
$22,500 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs