| Assessment Year | 2007 |
|---|---|
| Principal Product | Generator Sets |
| NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
100,000
ft2
|
| Annual Production | 1,200
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $71,918 | 1,454,074 |
kWh
|
$0.049 |
| Electricity Demand | $7,440 | 3,162 |
kW-mo/yr
|
$2.35 |
| Electricity Fees | $6,305 | - |
|
- |
| Natural Gas | $54,054 | 4,616 |
MMBtu
|
$11.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,888 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $32,663 | $120,000 | - | - |
$10,163
-
MMBtu
|
$22,500 | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,141 | $2,400 | - | - |
$5,141
-
MMBtu
|
- | - | |
| 03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,096 | $10,000 |
$1,310
28,476
kWh
|
$710
-
kW-mo/yr
|
- | $22 | $54 | |
| 04 | 2.7135: Install occupancy sensors | $534 | $525 |
$415
79,289
kWh
|
$119
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $225 | - |
$207
4,089
kWh
|
$18
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $111 | $150 |
$102
2,011
kWh
|
$9
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $40,770 | $133,075 |
$2,034
113,865
kWh
|
$856
-
kW-mo/yr
|
$15,304
-
MMBtu
|
$22,522 | $54 | ||
| TOTAL IMPLEMENTED | $32,888 | $120,000 |
$207
4,089
kWh
|
$18
-
kW-mo/yr
|
$10,163
-
MMBtu
|
$22,500 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs