Assessment Year | 2004 |
---|---|
Principal Product | Marble and Wood Products |
NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
SIC | 3088: Plastics Plumbing Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 188 |
Plant Area |
270,749
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 4,394
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $104,323 | 1,827,968 |
kWh
|
$0.057 |
Electricity Demand | $53,476 | 7,018 |
kW-mo/yr
|
$7.62 |
Electricity Fees | $1,680 | - |
|
- |
Natural Gas | $50,244 | 5,818 |
MMBtu
|
$8.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,844 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,223 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,725 | - |
$1,613
28,299
kWh
|
$1,112
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,502 | $350 |
$885
15,529
kWh
|
$617
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $513 | $442 |
$300
5,269
kWh
|
$213
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $26,177 | $53,000 | - | - |
$26,177
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,721 | $10,129 |
$3,456
60,637
kWh
|
$1,265
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $1,206 | $3,817 |
$749
13,141
kWh
|
$457
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $36,844 | $67,738 |
$7,003
122,875
kWh
|
$3,664
-
kW-mo/yr
|
$26,177
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,223 | $10,479 |
$4,341
76,166
kWh
|
$1,882
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs