ITAC Assessment: IC0122
ITAC logo
ITAC Assessment: IC0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product electronic connectors
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range greater than $500
M
# of Employees 1,200
Plant Area 560,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $682,791 10,610,494
kWh
Electricity Fees $16,188 -
Natural Gas $326,000 56,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $14,489 $58,358 $14,489
226,384
kWh
- - -
02 2.1224: Replace boiler $10,973 $46,865 - $10,973
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $3,130 $21,000 $3,130
48,912
kWh
- - -
04 2.7261: Install timers and/or thermostats $2,700 - - $2,700
-
MMBtu
- -
05 2.7135: Install occupancy sensors $1,480 $1,791 $1,480
23,127
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $490 - $472
7,381
kWh
- - $18
07 2.7142: Utilize higher efficiency lamps and/or ballasts $268 $816 $67
1,051
kWh
- $65 $136
TOTAL RECOMMENDED $33,530 $128,830 $19,638
306,855
kWh
$13,673
-
MMBtu
$65 $154
TOTAL IMPLEMENTED $19,159 $60,149 $16,441
256,892
kWh
$2,700
-
MMBtu
- $18
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs