| Assessment Year | 2006 |
|---|---|
| Principal Product | electronic connectors |
| NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
| SIC | 3643: Current-Carrying Wiring Devices |
| Sales Range | greater than $500 M |
| # of Employees | 1,200 |
| Plant Area |
560,000
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $682,791 | 10,610,494 |
kWh
|
$0.064 |
| Electricity Fees | $16,188 | - |
|
- |
| Natural Gas | $326,000 | 56,802 |
MMBtu
|
$5.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,159 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $14,489 | $58,358 |
$14,489
226,384
kWh
|
- | - | - | |
| 02 | 2.1224: Replace boiler | $10,973 | $46,865 | - |
$10,973
-
MMBtu
|
- | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $3,130 | $21,000 |
$3,130
48,912
kWh
|
- | - | - | |
| 04 | 2.7261: Install timers and/or thermostats | $2,700 | - | - |
$2,700
-
MMBtu
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $1,480 | $1,791 |
$1,480
23,127
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $490 | - |
$472
7,381
kWh
|
- | - | $18 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $268 | $816 |
$67
1,051
kWh
|
- | $65 | $136 | |
| TOTAL RECOMMENDED | $33,530 | $128,830 |
$19,638
306,855
kWh
|
$13,673
-
MMBtu
|
$65 | $154 | ||
| TOTAL IMPLEMENTED | $19,159 | $60,149 |
$16,441
256,892
kWh
|
$2,700
-
MMBtu
|
- | $18 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs