Assessment Year | 2000 |
---|---|
Principal Product | Drill bushings |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
85,000
ft2
|
Annual Production | 210,000
lb
|
Production Hrs. Annual | 4,225
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,274 | 1,606,682 |
kWh
|
$0.074 |
Electricity Demand | $39,492 | 4,768 |
kW-mo/yr
|
$8.28 |
Electricity Fees | $723 | - |
|
- |
Natural Gas | $41,209 | 9,879 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,545 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,718 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $9,187 | $350 | - | - |
$9,187
-
MMBtu
|
- | - | |
02 | 2.2511: Insulate bare equipment | $4,966 | $664 | - | - |
$4,966
-
MMBtu
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,693 | $5,000 |
$3,720
50,703
kWh
|
$973
-
kW-mo/yr
|
- | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $3,316 | $5,000 | - | - |
$3,316
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,040 | $200 |
$3,179
43,083
kWh
|
$861
-
kW-mo/yr
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,438 | $1,438 |
$1,137
15,533
kWh
|
$301
-
kW-mo/yr
|
- | - | - | |
07 | 2.2425: Use flue gases to heat process or service water | $1,315 | $1,000 | - | - |
$1,315
-
MMBtu
|
- | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,240 | $7,900 | - | - | - | - | $2,240 | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $75,350 | $10,050 | - | - | - | $75,350 | - | |
TOTAL RECOMMENDED | $106,545 | $31,602 |
$8,036
109,319
kWh
|
$2,135
-
kW-mo/yr
|
$18,784
-
MMBtu
|
$75,350 | $2,240 | ||
TOTAL IMPLEMENTED | $7,718 | $9,538 |
$4,316
58,616
kWh
|
$1,162
-
kW-mo/yr
|
- | - | $2,240 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs