ITAC Assessment: BS0119
ITAC logo
ITAC Assessment: BS0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 364,000
ft2
Annual Production 1,387,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,648 4,502,970
kWh
Electricity Demand $79,399 9,263
kW-mo/yr
Natural Gas $28,984 5,870
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $79,000 17,190,040
lb
TOTAL YEARLY COSTS $479,031
RECOMMENDED SAVINGS* $2,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $36 $30 $26
400
kWh
$10
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $126 $165 $126
1,945
kWh
- -
03 2.1113: Reduce combustion air flow to optimum $2,022 $30 - - $2,022
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $658 $20 $472
7,256
kWh
$187
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,843 $245 $624
9,601
kWh
$197
-
kW-mo/yr
$2,022
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs