| Assessment Year | 2019 |
|---|---|
| Principal Product | Water Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 26 |
| Plant Area |
364,000
ft2
|
| Annual Production | 1,387,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $291,648 | 4,502,970 |
kWh
|
$0.065 | |
| Electricity Demand | $79,399 | 9,263 |
kW-mo/yr
|
$8.57 | |
| Natural Gas | $28,984 | 5,870 |
MMBtu
|
$4.94 | |
| Waste Disposal Costs | |||||
| Solid Waste (non-haz) | $79,000 | 17,190,040 |
lb
|
$0.005 | |
| TOTAL YEARLY COSTS | $479,031 | ||||
| RECOMMENDED SAVINGS* | $2,843 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $36 | $30 |
$26
400
kWh
|
$10
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $126 | $165 |
$126
1,945
kWh
|
- | - | |
| 03 | 2.1113: Reduce combustion air flow to optimum | $2,022 | $30 | - | - |
$2,022
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $658 | $20 |
$472
7,256
kWh
|
$187
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $2,843 | $245 |
$624
9,601
kWh
|
$197
-
kW-mo/yr
|
$2,022
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs