ITAC Assessment: SD0588
ITAC logo
ITAC Assessment: SD0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Circuit Boards
NAICS 334111: Electronic Computer Manufacturing
SIC 3571: Electronic Computers
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 83,972
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,860
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,482 908,236
kWh
Electricity Demand $65,983 4,054
kW-mo/yr
Electricity Fees $25,648 -
Natural Gas $5,220 689
MMBtu
Other Gas $721 1
MMBtu
TOTAL YEARLY COSTS $206,054
RECOMMENDED SAVINGS* $17,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,633 $32,287 $7,273
60,928
kWh
$6,044
-
kW-mo/yr
- $316
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,578 $7,495 $2,766
23,166
kWh
$667
-
kW-mo/yr
$(-855.0)
-
MMBtu
-
03 2.7135: Install occupancy sensors $812 $1,395 $812
6,804
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $407 - $407
3,415
kWh
- - -
TOTAL RECOMMENDED $17,430 $41,177 $11,258
94,313
kWh
$6,711
-
kW-mo/yr
$(-855.0)
-
MMBtu
$316
TOTAL IMPLEMENTED $17,430 $41,177 $11,258
94,313
kWh
$6,711
-
kW-mo/yr
$(-855.0)
-
MMBtu
$316
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs