ITAC Assessment: WV0343
ITAC logo
ITAC Assessment: WV0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Speciality Graphite
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 899,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,824
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,607,560 76,660,000
kWh
Electricity Demand $1,338,122 177,214
kW-mo/yr
Natural Gas $4,771,868 491,893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,320,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1113: Reduce combustion air flow to optimum $1,166,408 $1,460,000 - - $1,166,408
-
MMBtu
-
02 2.2442: Preheat combustion air with waste heat $1,096,704 $1,539,100 - - $1,096,704
-
MMBtu
-
03 2.2511: Insulate bare equipment $21,955 $3,114 - - $21,955
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,918 - $12,666
604,440
kWh
$6,252
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $11,836 $2,255 $(-37.0)
(-1,758)
kWh
$(-23.0)
-
kW-mo/yr
$11,896
-
MMBtu
-
06 2.4151: Develop a repair/replace policy $4,236 $635 $3,134
149,430
kWh
$1,750
-
kW-mo/yr
- $(-648.0)
TOTAL RECOMMENDED $2,320,057 $3,005,104 $15,763
752,112
kWh
$7,979
-
kW-mo/yr
$2,296,963
-
MMBtu
$(-648.0)
TOTAL IMPLEMENTED $45,109 $3,749 $15,800
753,870
kWh
$8,002
-
kW-mo/yr
$21,955
-
MMBtu
$(-648.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs