Assessment Year | 2006 |
---|---|
Principal Product | Speciality Graphite |
NAICS | 335991: Carbon and Graphite Product Manufacturing |
SIC | 3624: Carbon and Graphite Products |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
899,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 5,824
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,607,560 | 76,660,000 |
kWh
|
$0.021 |
Electricity Demand | $1,338,122 | 177,214 |
kW-mo/yr
|
$7.55 |
Natural Gas | $4,771,868 | 491,893 |
MMBtu
|
$9.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,320,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,109 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $1,166,408 | $1,460,000 | - | - |
$1,166,408
-
MMBtu
|
- | |
02 | 2.2442: Preheat combustion air with waste heat | $1,096,704 | $1,539,100 | - | - |
$1,096,704
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $21,955 | $3,114 | - | - |
$21,955
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,918 | - |
$12,666
604,440
kWh
|
$6,252
-
kW-mo/yr
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $11,836 | $2,255 |
$(-37.0)
(-1,758)
kWh
|
$(-23.0)
-
kW-mo/yr
|
$11,896
-
MMBtu
|
- | |
06 | 2.4151: Develop a repair/replace policy | $4,236 | $635 |
$3,134
149,430
kWh
|
$1,750
-
kW-mo/yr
|
- | $(-648.0) | |
TOTAL RECOMMENDED | $2,320,057 | $3,005,104 |
$15,763
752,112
kWh
|
$7,979
-
kW-mo/yr
|
$2,296,963
-
MMBtu
|
$(-648.0) | ||
TOTAL IMPLEMENTED | $45,109 | $3,749 |
$15,800
753,870
kWh
|
$8,002
-
kW-mo/yr
|
$21,955
-
MMBtu
|
$(-648.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs