Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Switchgear and switchboard apparatus manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0488 #06 Y:2016 Install compressor air intakes in coolest locations $236 $800
BD0488 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $581 $425
BD0488 #04 Y:2016 Use / purchase optimum sized compressor $1,615 $1,500
BD0488 #03 Y:2016 Use most efficient type of electric motors $4,115 $3,770
BD0488 #02 Y:2016 Install occupancy sensors $4,187 $600
BD0488 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $19,086 $45,630
BD0225 #16 Y:2002 Replace existing equipment with more suitable substitutes $900 $300
BD0225 #15 Y:2002 Automate payroll system $2,080 $2,500
BD0225 #14 Y:2002 Use power during off-peak periods $3,393 $4,000
BD0225 #13 Y:2002 Contract a wood pallet recycling company $400 $120
BD0225 #12 Y:2002 Separate and recycle scrap metal to foundry or for sale $3,180 $500
BD0225 #11 Y:2002 Convert to high volume low pressure (hvlp) paint guns $7,920 $2,200
BD0225 #10 Y:2002 Use most efficient type of electric motors $224 $1,000
BD0225 #09 Y:2002 Use synthetic lubricant $240 $350
BD0225 #08 Y:2002 Utilize higher efficiency lamps and/or ballasts $338 $270
BD0225 #07 Y:2002 Disconnect ballasts $442 $60
BD0225 #06 Y:2002 Utilize higher efficiency lamps and/or ballasts $439 $2,280
BD0225 #05 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $873 $300
BD0225 #04 Y:2002 Utilize higher efficiency lamps and/or ballasts $724 $3,630
BD0225 #03 Y:2002 Replace electrically-operated equipment with fossil fuel equipment $1,618 $5,072