Assessment Year | 2024 |
---|---|
Principal Product | Electrical motors and Electrical panels manufacturing |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
300,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 4,914
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $281,592 | 2,748,854 |
kWh
|
$0.10 | |
Electricity Demand | $86,348 | 7,643 |
kW-mo/yr
|
$11.30 | |
Electricity Fees | $26,775 | - |
|
- | |
Natural Gas | $84,738 | 101,785 |
MMBtu
|
$0.83 | |
Waste Disposal Costs | |||||
Water Usage | $37,095 | 23 |
Tgal
|
$1,637.24 | |
TOTAL YEARLY COSTS | $516,548 | ||||
RECOMMENDED SAVINGS* | $107,513 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,518 | $5,609 |
$5,135
50,147
kWh
|
$1,383
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,367 | - |
$3,440
33,596
kWh
|
$927
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,571 | $9,184 |
$17,316
169,100
kWh
|
$5,255
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,586 | $20,775 |
$10,413
101,687
kWh
|
$3,173
-
kW-mo/yr
|
- | |
05 | 4.812: Apply for investment incentives | $27,609 | $10,000 | - | - | $27,609 | |
06 | 2.3212: Optimize plant power factor | $11,431 | $6,584 | - |
$11,431
-
kW-mo/yr
|
- | |
07 | 2.4224: Upgrade controls on compressors | $21,431 | $520 |
$21,431
209,289
kWh
|
- | - | |
TOTAL RECOMMENDED | $107,513 | $52,672 |
$57,735
563,819
kWh
|
$22,169
-
kW-mo/yr
|
$27,609 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs