ITAC Assessment: NT0028
ITAC logo
ITAC Assessment: NT0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electrical motors and Electrical panels manufacturing
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,914
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,592 2,748,854
kWh
Electricity Demand $86,348 7,643
kW-mo/yr
Electricity Fees $26,775 -
Natural Gas $84,738 101,785
MMBtu
Waste Disposal Costs
Water Usage $37,095 23
Tgal
TOTAL YEARLY COSTS $516,548
RECOMMENDED SAVINGS* $107,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,518 $5,609 $5,135
50,147
kWh
$1,383
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,367 - $3,440
33,596
kWh
$927
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,571 $9,184 $17,316
169,100
kWh
$5,255
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,586 $20,775 $10,413
101,687
kWh
$3,173
-
kW-mo/yr
-
05 4.812: Apply for investment incentives $27,609 $10,000 - - $27,609
06 2.3212: Optimize plant power factor $11,431 $6,584 - $11,431
-
kW-mo/yr
-
07 2.4224: Upgrade controls on compressors $21,431 $520 $21,431
209,289
kWh
- -
TOTAL RECOMMENDED $107,513 $52,672 $57,735
563,819
kWh
$22,169
-
kW-mo/yr
$27,609
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs