ITAC Assessment: WI0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product WALL BOARD - GYPSUM
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $767,857 12,096,718
kWh
Natural Gas $1,648,369 598,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,656

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3134: Shift from daytime to nighttime operation $25,487 - $29,087
-
kWh
$(-3,600.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,611 $1,764 $2,611
41,032
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,656 - $1,656
26,084
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $788 $2,000 $788
12,309
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $257 $97 $257
3,810
kWh
-
06 2.6232: Install set-back timers $228 $200 $228
3,517
kWh
-
TOTAL RECOMMENDED $31,027 $4,061 $34,627
86,752
kWh
$(-3,600.0)
TOTAL IMPLEMENTED $3,656 $3,861 $3,656
57,151
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs