ITAC Assessment: GT0403
ITAC logo
ITAC Assessment: GT0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ADHESIVES & SOLID WASTES
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,346 2,565,065
kWh
Natural Gas $96,851 17,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $921 $277 $921
14,361
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,276 - $1,276
19,637
kWh
-
03 2.4133: Use most efficient type of electric motors $1,588 $4,065 $1,588
24,619
kWh
-
04 2.1232: Keep boiler tubes clean $1,160 $1,000 - $1,160
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $5,610 $9,150 - $5,610
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $5,760 $275 - $5,760
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $7,876 $5,715 - $7,876
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $5,730 - $5,730
87,925
kWh
-
09 2.6232: Install set-back timers $750 $300 $750
11,723
kWh
-
TOTAL RECOMMENDED $30,671 $20,782 $10,265
158,265
kWh
$20,406
-
MMBtu
TOTAL IMPLEMENTED $10,705 $5,617 $3,785
58,617
kWh
$6,920
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs