ITAC Assessment: OR0397
ITAC logo
ITAC Assessment: OR0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel Castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 75,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,538 7,188,140
kWh
Electricity Demand $87,685 27,192
kW-mo/yr
Electricity Fees $20,968 -
Natural Gas $292,059 38,366
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,700 $5,500 $4,600
171,300
kWh
$1,100
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $9,700 $18,800 $7,000
260,800
kWh
$2,700
-
kW-mo/yr
-
03 2.4322: Use or replace with energy efficient substitutes $6,600 $15,463 $5,300
197,541
kWh
$1,300
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $1,929 $1,568 $1,516
56,599
kWh
$413
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $2,426 $4,000 - - $2,426
TOTAL RECOMMENDED $26,355 $45,331 $18,416
686,240
kWh
$5,513
-
kW-mo/yr
$2,426
TOTAL IMPLEMENTED $17,329 $25,868 $13,116
488,699
kWh
$4,213
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs