ITAC Assessment: SU0420
ITAC logo
ITAC Assessment: SU0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Photobooths
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 41,000
ft2
Annual Production 720
units
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,606 242,185
kWh
Electricity Demand $9,802 1,516
kW-mo/yr
Electricity Fees $4,451 -
Natural Gas $14,286 3,995
MMBtu
TOTAL YEARLY COSTS $42,145
RECOMMENDED SAVINGS* $13,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $378 - - - - - $378
02 2.8121: Apply for tax-free status for energy purchases $2,686 - - - - - $2,686
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $272 - $163
2,912
kWh
$109
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $580 - $269
4,799
kWh
$311
-
kW-mo/yr
- - -
05 2.1224: Replace boiler $5,360 $420 - - $5,360
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $63 $23 $27
482
kWh
$5
-
kW-mo/yr
- $23 $8
07 2.4221: Install compressor air intakes in coolest locations $164 $175 $164
2,920
kWh
- - - -
08 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $920 $1,244 $920
16,427
kWh
- - - -
09 2.6211: Conserve energy by efficient use of vending machines $239 $501 $239
4,265
kWh
- - - -
10 3.1161: Eliminate/reduce an operation $382 $1,110 $(-15.0)
(-263)
kWh
$(-233.0)
-
kW-mo/yr
- $350 $280
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,240 $8,156 $1,200
21,424
kWh
$800
-
kW-mo/yr
- $290 $(-50.0)
12 2.7447: Install vinyl strip / high speed / air curtain doors $81 $368 - - $81
-
MMBtu
- -
TOTAL RECOMMENDED $13,365 $11,997 $2,967
52,966
kWh
$992
-
kW-mo/yr
$5,441
-
MMBtu
$663 $3,302
TOTAL IMPLEMENTED $6,941 $10,533 $2,295
40,982
kWh
$681
-
kW-mo/yr
- $663 $3,302
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs