ITAC Assessment: CC0034
ITAC logo
ITAC Assessment: CC0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Switchboards and Panelboards
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $100
M
to 500
M
# of Employees 650
Plant Area 230,000
ft2
Annual Production 84,000
units
Production Hrs. Annual 5,928
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,511 6,390,465
kWh
Electricity Demand $259,591 18,515
kW-mo/yr
Electricity Fees $3,984 -
Natural Gas $283,919 24,372
MMBtu
TOTAL YEARLY COSTS $867,005
RECOMMENDED SAVINGS* $50,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $4,576 - $4,576
91,520
kWh
- -
02 2.2425: Use flue gases to heat process or service water $27,911 $90,000 - - $27,911
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,767 $5,000 $5,084
101,680
kWh
$1,683
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $5,092 $11,542 - - $5,092
-
MMBtu
05 2.6215: Shut off air conditioning in winter heating season $3,666 - $3,666
73,324
kWh
- -
06 2.7241: Install outside air damper / economizer on hvac unit $2,138 $2,000 $2,138
42,763
kWh
- -
TOTAL RECOMMENDED $50,150 $108,542 $15,464
309,287
kWh
$1,683
-
kW-mo/yr
$33,003
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs