| Assessment Year | 2024 |
|---|---|
| Principal Product | Switchboards and Panelboards |
| NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
| SIC | 3613: Switchgear and Switchboard Apparatus |
| Sales Range | $100 M to 500M |
| # of Employees | 650 |
| Plant Area |
230,000
ft2
|
| Annual Production | 84,000
units
|
| Production Hrs. Annual | 5,928
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $319,511 | 6,390,465 |
kWh
|
$0.050 |
| Electricity Demand | $259,591 | 18,515 |
kW-mo/yr
|
$14.02 |
| Electricity Fees | $3,984 | - |
|
- |
| Natural Gas | $283,919 | 24,372 |
MMBtu
|
$11.65 |
| TOTAL YEARLY COSTS | $867,005 | |||
| RECOMMENDED SAVINGS* | $50,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $4,576 | - |
$4,576
91,520
kWh
|
- | - | |
| 02 | 2.2425: Use flue gases to heat process or service water | $27,911 | $90,000 | - | - |
$27,911
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,767 | $5,000 |
$5,084
101,680
kWh
|
$1,683
-
kW-mo/yr
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $5,092 | $11,542 | - | - |
$5,092
-
MMBtu
|
|
| 05 | 2.6215: Shut off air conditioning in winter heating season | $3,666 | - |
$3,666
73,324
kWh
|
- | - | |
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $2,138 | $2,000 |
$2,138
42,763
kWh
|
- | - | |
| TOTAL RECOMMENDED | $50,150 | $108,542 |
$15,464
309,287
kWh
|
$1,683
-
kW-mo/yr
|
$33,003
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs