ITAC Assessment: AS0484
ITAC logo
ITAC Assessment: AS0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Fluid Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range less than $500
k
# of Employees 120
Plant Area 8,800,000
ft2
Annual Production 21,900
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,468,532 34,573,202
kWh
Electricity Demand $397,710 79,542
kW-mo/yr
Electricity Fees $56,951 -
Other Energy $38,081 2,297
MMBtu
TOTAL YEARLY COSTS $1,961,274
RECOMMENDED SAVINGS* $1,349,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,286,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings By-product Production Savings
01 2.9141: Install anaerobic digester $1,259,928 $10,007,562 - - - - $866,006 $393,922
02 2.4322: Use or replace with energy efficient substitutes $61,233 $231,375 $52,769
1,235,803
kWh
$8,464
-
kW-mo/yr
- - - -
03 2.1332: Convert combustion equipment to burn natural gas $26,610 $79,200 - - $(-9,176.0)
-
MMBtu
$35,786
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,035 $5,600 $1,754
40,982
kWh
$281
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,349,806 $10,323,737 $54,523
1,276,785
kWh
$8,745
-
kW-mo/yr
$(-9,176.0)
-
MMBtu
$35,786
-
MMBtu
$866,006 $393,922
TOTAL IMPLEMENTED $1,286,538 $10,086,762 - - $(-9,176.0)
-
MMBtu
$35,786
-
MMBtu
$866,006 $393,922
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs