ITAC Assessment: MI0453
ITAC logo
ITAC Assessment: MI0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product 1. Piezes, solenoids, switches, 2. Thermoplastics ( contactors and starters)
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 236,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 6,656
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $832,093 3,907,609
kWh
Electricity Demand $89,566 11,166
kW-mo/yr
Electricity Fees $5,881 -
Waste Disposal Costs
Water Usage $6,444 54
Tgal
TOTAL YEARLY COSTS $933,984
RECOMMENDED SAVINGS* $86,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 3.3125: Use distillation, evaporation to remove contaminants $43,981 $80,000 - - $6,444
-
Tgal
$37,537
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,805 $1,620 $12,841
60,285
kWh
$1,964
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,219 $14,799 $13,313
62,504
kWh
$906
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $8,976 $11,882 $8,405
39,458
kWh
$571
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $4,117 $1,690 $4,117
19,329
kWh
- - -
TOTAL RECOMMENDED $86,098 $109,991 $38,676
181,576
kWh
$3,441
-
kW-mo/yr
$6,444
-
Tgal
$37,537
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs