199
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Power, distribution, and specialty transformer manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0357 #10 Y:2026 | 10 | 2026 | Clean and maintain refrigerant condensers and towers | $2,327 | $10,000 |
n/a
|
| TT0357 #09 Y:2026 | 09 | 2026 | Preheat boiler makeup water with waste process heat | $3,453 | $11,000 |
n/a
|
| TT0357 #08 Y:2026 | 08 | 2026 | Reduce the pressure of compressed air to the minimum required | $3,817 | $31 |
n/a
|
| TT0357 #07 Y:2026 | 07 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $4,611 | $22,500 |
n/a
|
| TT0357 #06 Y:2026 | 06 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $5,947 | $5,000 |
n/a
|
| TT0357 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,880 | $1,500 |
n/a
|
| TT0357 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $13,816 | $30,000 |
n/a
|
| TT0357 #03 Y:2026 | 03 | 2026 | Use / purchase optimum sized compressor | $18,291 | $80,000 |
n/a
|
| TT0357 #02 Y:2026 | 02 | 2026 | Meter waste water | $20,750 | $5,000 |
n/a
|
| TT0357 #01 Y:2026 | 01 | 2026 | Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca | $112,051 | $500,000 |
n/a
|
| LE0558 #07 Y:2023 | 07 | 2023 | Re-use or recycle hot or cold process exhaust air | $474 | $2,500 | |
| LE0558 #06 Y:2023 | 06 | 2023 | Clean or color roof to reduce solar load | $7,995 | $37,000 | |
| LE0558 #05 Y:2023 | 05 | 2023 | Use / purchase optimum sized compressor | $4,840 | $18,014 | |
| LE0558 #04 Y:2023 | 04 | 2023 | Reduce the pressure of compressed air to the minimum required | $896 | $2,000 | |
| LE0558 #03 Y:2023 | 03 | 2023 | Install timers and/or thermostats | $1,010 | $1,600 | |
| LE0558 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,863 | $5,799 | |
| LE0558 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,762 | $1,400 | |
| WM0206 #04 Y:2023 | 04 | 2023 | Reduce the pressure of compressed air to the minimum required | $261 | - | |
| WM0206 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $297 | $125 | |
| WM0206 #02 Y:2023 | 02 | 2023 | Install occupancy sensors | $1,568 | $787 |