Assessment Year | 2023 |
---|---|
Principal Product | Transformer Bushings |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
227,430
ft2
|
Annual Production | 502,080
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $919,833 | 12,121,200 |
kWh
|
$0.076 | |
Electricity Demand | $308,389 | 20,536 |
kW-mo/yr
|
$15.02 | |
Natural Gas | $62,184 | 4,609 |
MMBtu
|
$13.49 | |
Waste Disposal Costs | |||||
Water Usage | $20,225 | 4,190 |
Tgal
|
$4.83 | |
Water Disposal | $19,945 | 4,190 |
Tgal
|
$4.76 | |
TOTAL YEARLY COSTS | $1,330,576 | ||||
RECOMMENDED SAVINGS* | $302,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $181,798 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $141,741 | $909,720 |
$41,228
543,186
kWh
|
- |
$513
-
MMBtu
|
- | $100,000 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $61,184 | $15,000 |
$61,184
806,113
kWh
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,359 | $90,000 |
$44,359
584,443
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,127 | $1,500 |
$16,622
219,000
kWh
|
$4,505
-
kW-mo/yr
|
- | - | - | |
05 | 3.4155: Meter waste water | $18,930 | $1,100 | - | - | - |
$18,930
-
Tgal
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,886 | - |
$6,886
90,720
kWh
|
- | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,990 | $20,000 |
$4,990
65,750
kWh
|
- | - | - | - | |
08 | 2.4237: Substitute compressed air cooling with water or air cooling | $2,956 | $965 |
$2,956
38,951
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $302,173 | $1,038,285 |
$178,225
2,348,163
kWh
|
$4,505
-
kW-mo/yr
|
$513
-
MMBtu
|
$18,930
-
Tgal
|
$100,000 | ||
TOTAL IMPLEMENTED | $181,798 | $912,320 |
$57,850
762,186
kWh
|
$4,505
-
kW-mo/yr
|
$513
-
MMBtu
|
$18,930
-
Tgal
|
$100,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs