ITAC Assessment: TT0302
ITAC logo
ITAC Assessment: TT0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Transformer Bushings
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 227,430
ft2
Annual Production 502,080
units
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $919,833 12,121,200
kWh
Electricity Demand $308,389 20,536
kW-mo/yr
Natural Gas $62,184 4,609
MMBtu
Waste Disposal Costs
Water Usage $20,225 4,190
Tgal
Water Disposal $19,945 4,190
Tgal
TOTAL YEARLY COSTS $1,330,576
RECOMMENDED SAVINGS* $302,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $181,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $141,741 $909,720 $41,228
543,186
kWh
- $513
-
MMBtu
- $100,000
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,184 $15,000 $61,184
806,113
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,359 $90,000 $44,359
584,443
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,127 $1,500 $16,622
219,000
kWh
$4,505
-
kW-mo/yr
- - -
05 3.4155: Meter waste water $18,930 $1,100 - - - $18,930
-
Tgal
-
06 2.6212: Turn off equipment during breaks, reduce operating time $6,886 - $6,886
90,720
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,990 $20,000 $4,990
65,750
kWh
- - - -
08 2.4237: Substitute compressed air cooling with water or air cooling $2,956 $965 $2,956
38,951
kWh
- - - -
TOTAL RECOMMENDED $302,173 $1,038,285 $178,225
2,348,163
kWh
$4,505
-
kW-mo/yr
$513
-
MMBtu
$18,930
-
Tgal
$100,000
TOTAL IMPLEMENTED $181,798 $912,320 $57,850
762,186
kWh
$4,505
-
kW-mo/yr
$513
-
MMBtu
$18,930
-
Tgal
$100,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs