Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Asphalt Shingles
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $50
M
to 100
M
# of Employees 154
Plant Area 126,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 6,432
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $483,800 11,427,316
kWh
Fuel Oil #2 $585,387 206,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,562 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.3212: Optimize plant power factor $9,114 $19,020 $9,114
-
kWh
-
02 2.1213: Direct warmest air to combustion intake $13,700 $7,500 - $13,700
-
MMBtu
03 2.4133: Use most efficient type of electric motors $4,024 $9,700 $4,024
200,762
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $452 $350 $452
10,844
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $745 $272
6,448
kWh
-
TOTAL RECOMMENDED $27,562 $37,315 $13,862
218,054
kWh
$13,700
-
MMBtu
TOTAL IMPLEMENTED $13,590 $29,070 $13,590
211,606
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs