ITAC Assessment: LE0558
ITAC logo
ITAC Assessment: LE0558
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metering Equipment
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 17,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 4,264
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,795 605,760
kWh
Electricity Demand $10,265 1,926
kW-mo/yr
Electricity Fees $2,487 -
Natural Gas $3,935 316
MMBtu
TOTAL YEARLY COSTS $119,482
RECOMMENDED SAVINGS* $20,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,762 $1,400 $1,639
9,639
kWh
$123
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,863 $5,799 $3,628
21,344
kWh
$235
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $1,010 $1,600 $873
5,134
kWh
- $137
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $896 $2,000 $832
4,897
kWh
$64
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $4,840 $18,014 $4,501
26,482
kWh
$339
-
kW-mo/yr
-
06 2.7425: Clean or color roof to reduce solar load $7,995 $37,000 $7,160
42,118
kWh
$438
-
kW-mo/yr
$397
-
MMBtu
07 2.2443: Re-use or recycle hot or cold process exhaust air $474 $2,500 - - $474
-
MMBtu
TOTAL RECOMMENDED $20,840 $68,313 $18,633
109,614
kWh
$1,199
-
kW-mo/yr
$1,008
-
MMBtu
TOTAL IMPLEMENTED $19,944 $66,313 $17,801
104,717
kWh
$1,135
-
kW-mo/yr
$1,008
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs