Assessment Year | 2024 |
---|---|
Principal Product | Metering Equipment |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
17,000
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 4,264
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,795 | 605,760 |
kWh
|
$0.17 |
Electricity Demand | $10,265 | 1,926 |
kW-mo/yr
|
$5.33 |
Electricity Fees | $2,487 | - |
|
- |
Natural Gas | $3,935 | 316 |
MMBtu
|
$12.45 |
TOTAL YEARLY COSTS | $119,482 | |||
RECOMMENDED SAVINGS* | $20,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,944 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,762 | $1,400 |
$1,639
9,639
kWh
|
$123
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,863 | $5,799 |
$3,628
21,344
kWh
|
$235
-
kW-mo/yr
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,010 | $1,600 |
$873
5,134
kWh
|
- |
$137
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $896 | $2,000 |
$832
4,897
kWh
|
$64
-
kW-mo/yr
|
- | |
05 | 2.4226: Use / purchase optimum sized compressor | $4,840 | $18,014 |
$4,501
26,482
kWh
|
$339
-
kW-mo/yr
|
- | |
06 | 2.7425: Clean or color roof to reduce solar load | $7,995 | $37,000 |
$7,160
42,118
kWh
|
$438
-
kW-mo/yr
|
$397
-
MMBtu
|
|
07 | 2.2443: Re-use or recycle hot or cold process exhaust air | $474 | $2,500 | - | - |
$474
-
MMBtu
|
|
TOTAL RECOMMENDED | $20,840 | $68,313 |
$18,633
109,614
kWh
|
$1,199
-
kW-mo/yr
|
$1,008
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,944 | $66,313 |
$17,801
104,717
kWh
|
$1,135
-
kW-mo/yr
|
$1,008
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs