ITAC Assessment: UA0203
ITAC logo
ITAC Assessment: UA0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Glulam Beam
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 47,500
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 3,146
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,705 1,177,836
kWh
Electricity Demand $30,973 8,230
kW-mo/yr
Electricity Fees $35,837 -
Natural Gas $43,588 3,490
MMBtu
TOTAL YEARLY COSTS $228,103
RECOMMENDED SAVINGS* $30,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,597 $23,433 $10,756
107,634
kWh
$2,088
-
kW-mo/yr
$753
02 2.7134: Use photocell controls $1,777 $7,719 $1,661
16,624
kWh
- $116
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,238 $2,765 $3,592
35,949
kWh
$369
-
kW-mo/yr
$277
04 2.4226: Use / purchase optimum sized compressor $3,434 $8,870 $2,649
26,507
kWh
$560
-
kW-mo/yr
$225
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,053 $200 $2,528
25,294
kWh
$325
-
kW-mo/yr
$200
06 2.3212: Optimize plant power factor $3,682 $2,568 - $3,441
-
kW-mo/yr
$241
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $567 $486 $435
4,350
kWh
$95
-
kW-mo/yr
$37
TOTAL RECOMMENDED $30,348 $46,041 $21,621
216,358
kWh
$6,878
-
kW-mo/yr
$1,849
TOTAL IMPLEMENTED $26,914 $37,171 $18,972
189,851
kWh
$6,318
-
kW-mo/yr
$1,624
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs