ITAC Assessment: IP0132
ITAC logo
ITAC Assessment: IP0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Custom Pumps
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 6,000
units
Production Hrs. Annual 4,375
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,687 3,772,800
kWh
Electricity Demand $375,010 16,744
kW-mo/yr
Electricity Fees $(-22,050.0) -
Natural Gas $23,576 14,167
MMBtu
Waste Disposal Costs
Water Usage $4,628 982
Tgal
Water Disposal $8,008 982
Tgal
TOTAL YEARLY COSTS $519,859
RECOMMENDED SAVINGS* $6,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $879 - $436
12,600
kWh
- $443
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,251 $64 $2,251
64,996
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $711 $47 $257
7,414
kWh
$454
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $2,488 $3,597 - - $2,488
-
MMBtu
TOTAL RECOMMENDED $6,329 $3,707 $2,944
85,010
kWh
$454
-
kW-mo/yr
$2,931
-
MMBtu
TOTAL IMPLEMENTED $2,962 $111 $2,508
72,410
kWh
$454
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs