ITAC Assessment: MI0168
ITAC logo
ITAC Assessment: MI0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 170,000
ft2
Annual Production 39,500
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $924,085 12,164,480
kWh
Electricity Demand $82,204 25,584
kW-mo/yr
Electricity Fees $148,104 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $428,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $169,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $256,906 $645,000 $243,633
2,784,219
kWh
$13,273
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $60,893 $2,040 $54,667
821,322
kWh
$6,226
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $32,290 $43,681 $29,715
339,595
kWh
$2,575
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,060 $1,210 $18,727
214,025
kWh
$333
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,713 $40 $1,568
17,971
kWh
$145
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $1,677 $3,475 $1,537
17,571
kWh
$140
-
kW-mo/yr
07 2.7447: Install vinyl strip / high speed / air curtain doors $33,795 $22,516 $32,049
366,274
kWh
$1,746
-
kW-mo/yr
08 2.6218: Turn off equipment when not in use $22,202 $3,320 $21,008
240,092
kWh
$1,194
-
kW-mo/yr
TOTAL RECOMMENDED $428,536 $721,282 $402,904
4,801,069
kWh
$25,632
-
kW-mo/yr
TOTAL IMPLEMENTED $169,953 $72,807 $157,734
1,999,279
kWh
$12,219
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs