Assessment Year | 2023 |
---|---|
Principal Product | Power Distribution Components |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
180,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 6,916
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $182,140 | 3,020,973 |
kWh
|
$0.060 |
Electricity Demand | $40,816 | 6,739 |
kW-mo/yr
|
$6.06 |
Electricity Fees | $15,676 | - |
|
- |
Natural Gas | $64,003 | 13,623 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | $302,635 | |||
RECOMMENDED SAVINGS* | $11,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,993 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,145 | $8,026 |
$6,054
100,395
kWh
|
$1,091
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,462 | $188 |
$1,244
20,637
kWh
|
$218
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,065 | $3,353 |
$677
11,224
kWh
|
$388
-
kW-mo/yr
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $678 | $50 |
$575
9,538
kWh
|
$103
-
kW-mo/yr
|
- | - | |
05 | 2.4224: Upgrade controls on compressors | $572 | $1,465 |
$536
8,883
kWh
|
$36
-
kW-mo/yr
|
- | - | |
06 | 2.4151: Develop a repair/replace policy | $502 | $617 |
$492
8,154
kWh
|
$85
-
kW-mo/yr
|
- | $(-75.0) | |
07 | 2.4239: Eliminate or reduce compressed air usage | $164 | $483 |
$140
2,314
kWh
|
$24
-
kW-mo/yr
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $122 | $600 | - | - |
$122
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $11,710 | $14,782 |
$9,718
161,145
kWh
|
$1,945
-
kW-mo/yr
|
$122
-
MMBtu
|
$(-75.0) | ||
TOTAL IMPLEMENTED | $3,993 | $5,291 |
$3,128
51,867
kWh
|
$818
-
kW-mo/yr
|
$122
-
MMBtu
|
$(-75.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs