Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electrical equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0260 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $10,349 $400
IC0260 #05 Y:2022 Install occupancy sensors $563 $1,190
IC0260 #04 Y:2022 Turn off equipment when not in use $4,800 -
IC0260 #03 Y:2022 Use waste heat from hot flue gases to preheat $2,387 $3,452
IC0260 #02 Y:2022 Recharge batteries on during off-peak demand periods $3,139 -
IC0260 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,208 $1,715
IC0246 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,840 $544
IC0246 #04 Y:2021 Eliminate leaks in water lines and valves $3,527 $1,200
IC0246 #03 Y:2021 Turn off equipment when not in use $20,948 $40,000
IC0246 #02 Y:2021 Install compressor air intakes in coolest locations $433 $214
IC0246 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $5,458 $4,300
BD0488 #06 Y:2016 Install compressor air intakes in coolest locations $236 $800
BD0488 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $581 $425
BD0488 #04 Y:2016 Use / purchase optimum sized compressor $1,615 $1,500
BD0488 #03 Y:2016 Use most efficient type of electric motors $4,115 $3,770
BD0488 #02 Y:2016 Install occupancy sensors $4,187 $600
BD0488 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $19,086 $45,630
BD0483 #11 Y:2016 Install occupancy sensors $243 $600
BD0483 #10 Y:2016 Use most efficient type of electric motors $286 $320
BD0483 #09 Y:2016 Install occupancy sensors $469 $600