ITAC Assessment: BD0483
ITAC logo
ITAC Assessment: BD0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Irrigation Control Equipment
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 94,250
ft2
Annual Production 500,000
units
Production Hrs. Annual 7,332
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,226 1,832,835
kWh
Electricity Demand $35,560 5,523
kW-mo/yr
Electricity Fees $2,149 -
Natural Gas $28,707 3,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $7,762 $1,810 $6,312
116,466
kWh
$1,450
-
kW-mo/yr
- - -
02 2.7231: Use radiant heater for spot heating $4,162 $8,800 - - $4,162
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,053 $10,965 $3,034
56,074
kWh
$2,006
-
kW-mo/yr
- $51 $(-1,038.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,476 $15 $2,909
53,777
kWh
$567
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,361 $9,836 $1,693
31,295
kWh
$1,120
-
kW-mo/yr
- $164 $(-616.0)
06 2.4221: Install compressor air intakes in coolest locations $2,961 $1,500 $2,478
45,809
kWh
$483
-
kW-mo/yr
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,172 $576 - - $1,172
-
MMBtu
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,074 $50 - $1,074
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $469 $600 $205
3,784
kWh
$264
-
kW-mo/yr
- - -
10 2.4133: Use most efficient type of electric motors $286 $320 $206
3,805
kWh
$80
-
kW-mo/yr
- - -
11 2.7135: Install occupancy sensors $243 $600 $106
1,968
kWh
$137
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $28,019 $35,072 $16,943
312,978
kWh
$7,181
-
kW-mo/yr
$5,334
-
MMBtu
$215 $(-1,654.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs