Assessment Year | 2017 |
---|---|
Principal Product | Steel products, rail-car maintanance |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 89 |
Plant Area |
2,000,000
ft2
|
Annual Production | 200
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $77,918 | 1,486,372 |
kWh
|
$0.052 | |
Electricity Demand | $73,675 | 8,048 |
kW-mo/yr
|
$9.15 | |
Electricity Fees | $87,554 | - |
|
- | |
Natural Gas | $28,944 | 3,678 |
MMBtu
|
$7.87 | |
Waste Disposal Costs | |||||
Water Usage | $850 | 418 |
Tgal
|
$2.03 | |
TOTAL YEARLY COSTS | $268,941 | ||||
RECOMMENDED SAVINGS* | $216,876 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $66,284 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.2124: Convert to air assisted / airless paint guns | $113,750 | $5,600 | - | - | - | - | $113,750 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,587 | $61,481 |
$12,130
336,936
kWh
|
$17,712
-
kW-mo/yr
|
$5,745 | - | - | - | |
03 | 2.2511: Insulate bare equipment | $32,948 | $23,006 |
$32,948
299,529
kWh
|
- | - | - | - | - | |
04 | 2.4224: Upgrade controls on compressors | $12,184 | $800 |
$4,441
122,042
kWh
|
$5,847
-
kW-mo/yr
|
$1,896 | - | - | - | |
05 | 2.8113: Purchase gas directly from a contract gas supplier | $6,334 | $400 | - | - | - | - | - | $6,334 | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,227 | $410 |
$5,272
58,043
kWh
|
$721
-
kW-mo/yr
|
$234 | - | - | - | |
07 | 2.4225: Install common header on compressors | $4,024 | $5,000 |
$1,467
40,310
kWh
|
$1,931
-
kW-mo/yr
|
$626 | - | - | - | |
08 | 2.3212: Optimize plant power factor | $3,894 | $3,500 | - | - | $3,894 | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,929 | - |
$2,304
64,007
kWh
|
- | - | $(-375.0) | - | - | |
TOTAL RECOMMENDED | $216,876 | $100,197 |
$58,561
920,868
kWh
|
$26,211
-
kW-mo/yr
|
$12,395 | $(-375.0) | $113,750 | $6,334 | ||
TOTAL IMPLEMENTED | $66,284 | $68,091 |
$25,613
621,338
kWh
|
$26,211
-
kW-mo/yr
|
$8,501 | $(-375.0) | - | $6,334 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs