ITAC Assessment: UU0120
ITAC logo
ITAC Assessment: UU0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Steel products, rail-car maintanance
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 2,000,000
ft2
Annual Production 200
units
Production Hrs. Annual 4,420
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,918 1,486,372
kWh
Electricity Demand $73,675 8,048
kW-mo/yr
Electricity Fees $87,554 -
Natural Gas $28,944 3,678
MMBtu
Waste Disposal Costs
Water Usage $850 418
Tgal
TOTAL YEARLY COSTS $268,941
RECOMMENDED SAVINGS* $216,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,284

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.2124: Convert to air assisted / airless paint guns $113,750 $5,600 - - - - $113,750 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,587 $61,481 $12,130
336,936
kWh
$17,712
-
kW-mo/yr
$5,745 - - -
03 2.2511: Insulate bare equipment $32,948 $23,006 $32,948
299,529
kWh
- - - - -
04 2.4224: Upgrade controls on compressors $12,184 $800 $4,441
122,042
kWh
$5,847
-
kW-mo/yr
$1,896 - - -
05 2.8113: Purchase gas directly from a contract gas supplier $6,334 $400 - - - - - $6,334
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,227 $410 $5,272
58,043
kWh
$721
-
kW-mo/yr
$234 - - -
07 2.4225: Install common header on compressors $4,024 $5,000 $1,467
40,310
kWh
$1,931
-
kW-mo/yr
$626 - - -
08 2.3212: Optimize plant power factor $3,894 $3,500 - - $3,894 - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,929 - $2,304
64,007
kWh
- - $(-375.0) - -
TOTAL RECOMMENDED $216,876 $100,197 $58,561
920,868
kWh
$26,211
-
kW-mo/yr
$12,395 $(-375.0) $113,750 $6,334
TOTAL IMPLEMENTED $66,284 $68,091 $25,613
621,338
kWh
$26,211
-
kW-mo/yr
$8,501 $(-375.0) - $6,334
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs