Assessment Year | 2016 |
---|---|
Principal Product | Laminated Buliding Panles |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 12 |
Plant Area |
156,000
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,349 | 473,856 |
kWh
|
$0.10 |
Electricity Demand | $33,492 | 3,116 |
kW-mo/yr
|
$10.75 |
Electricity Fees | $2,146 | - |
|
- |
Natural Gas | $8,959 | 1,432 |
MMBtu
|
$6.26 |
LPG | $6,162 | 378 |
MMBtu
|
$16.31 |
TOTAL YEARLY COSTS | $100,108 | |||
RECOMMENDED SAVINGS* | $29,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,086 | $45,630 |
$11,866
113,987
kWh
|
$7,069
-
kW-mo/yr
|
$41 | $110 | |
02 | 2.7135: Install occupancy sensors | $4,187 | $600 |
$2,624
25,205
kWh
|
$1,563
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,115 | $3,770 |
$2,579
24,772
kWh
|
$1,536
-
kW-mo/yr
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $1,615 | $1,500 |
$1,615
15,517
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $581 | $425 |
$123
1,186
kWh
|
$73
-
kW-mo/yr
|
$155 | $230 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $236 | $800 |
$148
1,422
kWh
|
$88
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $29,820 | $52,725 |
$18,955
182,089
kWh
|
$10,329
-
kW-mo/yr
|
$196 | $340 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs