ITAC Assessment: BD0488
ITAC logo
ITAC Assessment: BD0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Laminated Buliding Panles
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 156,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,349 473,856
kWh
Electricity Demand $33,492 3,116
kW-mo/yr
Electricity Fees $2,146 -
Natural Gas $8,959 1,432
MMBtu
LPG $6,162 378
MMBtu
TOTAL YEARLY COSTS $100,108
RECOMMENDED SAVINGS* $29,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,086 $45,630 $11,866
113,987
kWh
$7,069
-
kW-mo/yr
$41 $110
02 2.7135: Install occupancy sensors $4,187 $600 $2,624
25,205
kWh
$1,563
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $4,115 $3,770 $2,579
24,772
kWh
$1,536
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $1,615 $1,500 $1,615
15,517
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $581 $425 $123
1,186
kWh
$73
-
kW-mo/yr
$155 $230
06 2.4221: Install compressor air intakes in coolest locations $236 $800 $148
1,422
kWh
$88
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,820 $52,725 $18,955
182,089
kWh
$10,329
-
kW-mo/yr
$196 $340
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs