| Assessment Year | 2022 |
|---|---|
| Principal Product | Electrical Boxes |
| NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
| SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 670 |
| Plant Area |
360,000
ft2
|
| Annual Production | 1,560,000
units
|
| Production Hrs. Annual | 7,696
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $514,343 | 11,845,840 |
kWh
|
$0.043 | |
| Electricity Demand | $136,480 | 22,516 |
kW-mo/yr
|
$6.06 | |
| Natural Gas | $360,393 | 83,295 |
MMBtu
|
$4.33 | |
| Waste Disposal Costs | |||||
| Water Usage | $91,538 | 12,274 |
Tgal
|
$7.46 | |
| TOTAL YEARLY COSTS | $1,102,754 | ||||
| RECOMMENDED SAVINGS* | $22,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,208 | $1,715 |
$1,032
18,770
kWh
|
$176
-
kW-mo/yr
|
- | |
| 02 | 2.3132: Recharge batteries on during off-peak demand periods | $3,139 | - | - |
$3,139
-
kW-mo/yr
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $2,387 | $3,452 | - | - |
$2,387
-
MMBtu
|
|
| 04 | 2.6218: Turn off equipment when not in use | $4,800 | - |
$3,376
61,440
kWh
|
$1,424
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $563 | $1,190 |
$563
10,244
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,349 | $400 |
$8,832
160,573
kWh
|
$1,517
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $22,446 | $6,757 |
$13,803
251,027
kWh
|
$6,256
-
kW-mo/yr
|
$2,387
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs