ITAC Assessment: IP0059
ITAC logo
ITAC Assessment: IP0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Reusable steel racks for automotive parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 85,000
ft2
Annual Production 7,000
pieces
Production Hrs. Annual 2,383
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,316 364,880
kWh
Electricity Fees $3,005 -
Natural Gas $12,053 1,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,353 $58 $1,353
15,068
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $1,602 $99 $1,217
14,032
kWh
- $385
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $76 $62 $76
872
kWh
- -
04 4.812: Apply for investment incentives $1,633 $2,000 - $1,633 -
05 2.7135: Install occupancy sensors $1,345 $3,616 $1,345
13,942
kWh
- -
06 2.2511: Insulate bare equipment $257 $776 - - $257
-
MMBtu
TOTAL RECOMMENDED $6,266 $6,611 $3,991
43,914
kWh
$1,633 $642
-
MMBtu
TOTAL IMPLEMENTED $4,376 $3,835 $3,991
43,914
kWh
- $385
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs