ITAC Assessment: OR0327
ITAC logo
ITAC Assessment: OR0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Cookies
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 110,000
ft2
Annual Production 25,289,628
lb
Production Hrs. Annual 7,514
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,992 3,906,800
kWh
Electricity Demand $31,532 86,784
kW-mo/yr
Electricity Fees $1,780 -
Natural Gas $179,665 44,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $233,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $195,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 4.521: Clear and rent existing space $176,000 $200,000 - - - $176,000
-
lb
- - - - -
02 4.126: Install sensors to detect defects $20,040 $2,745 - - - - $1,725 - - - $18,315
03 4.631: Install an uninteruptable power supply $13,651 $22,265 - - - - - - - - $13,651
04 4.423: Move product using mechanical means $12,158 $28,400 $(-201.0)
(-5,862)
kWh
$(-41.0)
-
kW-mo/yr
- - $12,400 - - - -
05 3.1194: Use automatic flow control $1,896 $1,300 - - - - - - $1,896 - -
06 4.821: Pay bills on time to avoid late fees $986 - - - - - - $986 - - -
07 4.431: Train operators for maximum operating efficiency $577 $411 - - - - $577 - - - -
08 2.7134: Use photocell controls $1,460 $500 $1,051
30,774
kWh
- - - $194 - - $215 -
09 2.4231: Reduce the pressure of compressed air to the minimum required $3,863 - $3,205
94,080
kWh
$658
-
kW-mo/yr
- - - - - - -
10 2.3212: Optimize plant power factor $1,680 $11,200 - - $1,680 - - - - - -
11 2.4224: Upgrade controls on compressors $882 $1,210 $735
21,688
kWh
$147
-
kW-mo/yr
- - - - - - -
TOTAL RECOMMENDED $233,193 $268,031 $4,790
140,680
kWh
$764
-
kW-mo/yr
$1,680 $176,000
-
lb
$14,896 $986 $1,896 $215 $31,966
TOTAL IMPLEMENTED $195,044 $229,311 $4,055
118,992
kWh
$617
-
kW-mo/yr
- $176,000
-
lb
$13,171 $986 - $215 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs