ITAC Assessment: GT0882
ITAC logo
ITAC Assessment: GT0882
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Automotive Locking Mechanism
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 440
Plant Area 325,000
ft2
Annual Production 11,900,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,590 13,514,048
kWh
Electricity Demand $627,820 46,402
kW-mo/yr
Electricity Fees $36,140 -
Natural Gas $323,987 40,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $250,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,634 - $18,634
562,970
kWh
- - - $(-5,000.0)
02 2.6231: Utilize controls to operate equipment only when needed $7,201 - $7,201
217,560
kWh
- - - -
03 2.2628: Utilize a less expensive cooling method $28,143 $70,000 $4,601
139,010
kWh
$23,542
-
kW-mo/yr
- - -
04 3.4155: Meter waste water $3,614 $6,000 - - - $3,614
-
Tgal
-
05 2.4224: Upgrade controls on compressors $16,076 $55,000 $16,076
485,673
kWh
- - - -
06 2.7224: Reduce space conditioning during non-working hours $31,792 $136,000 $31,792
960,476
kWh
- - - -
07 2.4322: Use or replace with energy efficient substitutes $17,800 $38,640 $17,800
537,772
kWh
- - - -
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $85,358 $222,000 $2,671
80,706
kWh
- $82,687
-
MMBtu
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $47,117 $155,150 $28,283
854,462
kWh
$18,834
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $250,735 $682,790 $127,058
3,838,629
kWh
$42,376
-
kW-mo/yr
$82,687
-
MMBtu
$3,614
-
Tgal
$(-5,000.0)
TOTAL IMPLEMENTED $126,419 $384,790 $112,585
3,401,353
kWh
$18,834
-
kW-mo/yr
- - $(-5,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs