ITAC Assessment: WV0200
ITAC logo
ITAC Assessment: WV0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Potato Chips
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 180,950
ft2
Annual Production 16,500,000
lb
Production Hrs. Annual 6,732
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,750 3,850,528
kWh
Electricity Demand $121,659 8,932
kW-mo/yr
Natural Gas $349,672 75,067
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $272,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,112 $25 $3,112
120,164
kWh
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $35,579 $8,440 - $35,579
-
MMBtu
- -
03 2.4314: Use synthetic lubricant $1,587 $727 $1,587
61,254
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $471 $500 $471
18,171
kWh
- - -
05 2.4157: Establish a predictive maintenance program $2,070 $1,012 $2,070
41,032
kWh
- - -
06 2.2511: Insulate bare equipment $3,609 $636 - $3,609
-
MMBtu
- -
07 2.7135: Install occupancy sensors $615 $500 $615
23,740
kWh
- - -
08 2.2426: Use waste heat from flue gases to heat space conditioning air $32,382 $4,822 - $32,382
-
MMBtu
- -
09 2.8114: Change rate schedules or other changes in utility service $34,531 - - $34,531
-
MMBtu
- -
10 3.6126: Direct waste gasses to boiler combustion air $56,401 $150,000 - - $56,401
-
lb
-
11 4.441: Install automatic packing equipment $87,516 $120,000 - - - $87,516
12 4.424: Improve space comfort conditioning $15,000 $901 - - - $15,000
TOTAL RECOMMENDED $272,873 $287,563 $7,855
264,361
kWh
$106,101
-
MMBtu
$56,401
-
lb
$102,516
TOTAL IMPLEMENTED $45,380 $2,900 $7,240
240,621
kWh
$38,140
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs