| Assessment Year | 1997 |
|---|---|
| Principal Product | Fire-proof safes and vault doors |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 60 |
| Plant Area |
65,000
ft2
|
| Annual Production | 1,750
pieces
|
| Production Hrs. Annual | 2,168
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,783 | 951,348 |
kWh
|
$0.050 |
| Natural Gas | $61,749 | 9,081 |
MMBtu
|
$6.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,706 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2531: Re-size charging openings or add movable cover or door | $2,843 | $8,160 | - |
$2,843
-
MMBtu
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,456 | $68 |
$423
8,499
kWh
|
$2,033
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,442 | $90 |
$1,442
28,722
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $891 | $3,110 |
$891
17,878
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $380 | $770 |
$380
879
kWh
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $306 | $1,800 |
$306
6,155
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $238 | $60 |
$238
4,689
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $136 | $88 |
$136
2,638
kWh
|
- | - | |
| 09 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $14 | $30 | - | - |
$14
-
lb
|
|
| TOTAL RECOMMENDED | $8,706 | $14,176 |
$3,816
69,460
kWh
|
$4,876
-
MMBtu
|
$14
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs