ITAC Assessment: IC0246
ITAC logo
ITAC Assessment: IC0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Mechanical Power Transmission Products
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 110
Plant Area 69,490
ft2
Annual Production 2,200,000
units
Production Hrs. Annual 6,456
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,420 3,099,332
kWh
Electricity Demand $65,317 8,728
kW-mo/yr
Electricity Fees $38,559 -
Natural Gas $40,555 5,369
MMBtu
Waste Disposal Costs
Water Usage $30,294 2,644
Tgal
Water Disposal $5,027 2,662
Tgal
TOTAL YEARLY COSTS $347,172
RECOMMENDED SAVINGS* $33,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,458 $4,300 $3,900
72,227
kWh
$1,558
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $433 $214 $309
5,726
kWh
$124
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $20,948 $40,000 $20,948
387,920
kWh
- -
04 3.4154: Eliminate leaks in water lines and valves $3,527 $1,200 - - $3,527
-
Tgal
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,840 $544 $2,264
41,921
kWh
$576
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,205 $46,258 $27,421
507,794
kWh
$2,258
-
kW-mo/yr
$3,527
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs