| Assessment Year | 2021 |
|---|---|
| Principal Product | Mechanical Power Transmission Products |
| NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
| SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 110 |
| Plant Area |
69,490
ft2
|
| Annual Production | 2,200,000
units
|
| Production Hrs. Annual | 6,456
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $167,420 | 3,099,332 |
kWh
|
$0.054 | |
| Electricity Demand | $65,317 | 8,728 |
kW-mo/yr
|
$7.48 | |
| Electricity Fees | $38,559 | - |
|
- | |
| Natural Gas | $40,555 | 5,369 |
MMBtu
|
$7.55 | |
| Waste Disposal Costs | |||||
| Water Usage | $30,294 | 2,644 |
Tgal
|
$11.46 | |
| Water Disposal | $5,027 | 2,662 |
Tgal
|
$1.89 | |
| TOTAL YEARLY COSTS | $347,172 | ||||
| RECOMMENDED SAVINGS* | $33,205 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,458 | $4,300 |
$3,900
72,227
kWh
|
$1,558
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $433 | $214 |
$309
5,726
kWh
|
$124
-
kW-mo/yr
|
- | |
| 03 | 2.6218: Turn off equipment when not in use | $20,948 | $40,000 |
$20,948
387,920
kWh
|
- | - | |
| 04 | 3.4154: Eliminate leaks in water lines and valves | $3,527 | $1,200 | - | - |
$3,527
-
Tgal
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,840 | $544 |
$2,264
41,921
kWh
|
$576
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $33,205 | $46,258 |
$27,421
507,794
kWh
|
$2,258
-
kW-mo/yr
|
$3,527
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs