ITAC Assessment: NC0401
ITAC logo
ITAC Assessment: NC0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Saw blades and packaged tool accessories
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3425: Saw Blades and Handsaws
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 230,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,278 3,431,250
kWh
Electricity Demand $31,838 8,420
kW-mo/yr
Electricity Fees $4,586 -
Natural Gas $30,273 2,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $4,744 $3,600 $1,473
19,901
kWh
$301
-
kW-mo/yr
$2,970
-
MMBtu
- -
02 2.7241: Install outside air damper / economizer on hvac unit $7,833 - $7,112
96,140
kWh
$53
-
kW-mo/yr
- - $668
03 2.7425: Clean or color roof to reduce solar load $5,578 - $4,514
61,021
kWh
$877
-
kW-mo/yr
- - $187
04 2.6218: Turn off equipment when not in use $1,940 $7,800 $2,538
34,313
kWh
$302
-
kW-mo/yr
- - $(-900.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $845 $200 $1,656
22,380
kWh
$169
-
kW-mo/yr
- $(-800.0) $(-180.0)
06 2.2437: Recover waste heat from equipment $4,947 $6,200 - - $4,947
-
MMBtu
- -
07 2.7135: Install occupancy sensors $5,761 $3,750 $7,151
96,660
kWh
- - - $(-1,390.0)
TOTAL RECOMMENDED $31,648 $21,550 $24,444
330,415
kWh
$1,702
-
kW-mo/yr
$7,917
-
MMBtu
$(-800.0) $(-1,615.0)
TOTAL IMPLEMENTED $31,648 $21,550 $24,444
330,415
kWh
$1,702
-
kW-mo/yr
$7,917
-
MMBtu
$(-800.0) $(-1,615.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs