44
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0071 #04 Y:2011 | 04 | 2011 | Reduce the pressure of compressed air to the minimum required | $1,700 | $5 | |
| TT0071 #03 Y:2011 | 03 | 2011 | Re-use or recycle hot or cold process exhaust air | $13,100 | $8,000 | |
| TT0071 #02 Y:2011 | 02 | 2011 | Utilize higher efficiency lamps and/or ballasts | $27,400 | $52,100 | |
| TT0071 #01 Y:2011 | 01 | 2011 | Utilize higher efficiency lamps and/or ballasts | $43,100 | $66,100 | |
| TT0034 #08 Y:2008 | 08 | 2008 | Chill water to the highest temperature possible | $2,400 | - | |
| TT0034 #07 Y:2008 | 07 | 2008 | Minimize condenser cooling water temperature | $4,000 | - | |
| TT0034 #06 Y:2008 | 06 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $4,950 | $5,000 | |
| TT0034 #05 Y:2008 | 05 | 2008 | Utilize a less expensive cooling method | $13,300 | $20,000 | |
| TT0034 #04 Y:2008 | 04 | 2008 | Reduce the pressure of compressed air to the minimum required | $2,900 | $800 | |
| TT0034 #03 Y:2008 | 03 | 2008 | Use or replace with energy efficient substitutes | $3,250 | $4,800 | |
| TT0034 #02 Y:2008 | 02 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,800 | $2,500 | |
| TT0034 #01 Y:2008 | 01 | 2008 | Use / purchase optimum sized compressor | $20,000 | $47,500 | |
| GT0798 #07 Y:2004 | 07 | 2004 | Minimize operation of equipment maintained in standby condition | $6,739 | - | |
| GT0798 #06 Y:2004 | 06 | 2004 | Minimize operation of equipment maintained in standby condition | $4,855 | - | |
| GT0798 #05 Y:2004 | 05 | 2004 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $14,902 | $2,757 | |
| GT0798 #04 Y:2004 | 04 | 2004 | Install occupancy sensors | $1,633 | $400 | |
| GT0798 #03 Y:2004 | 03 | 2004 | Utilize higher efficiency lamps and/or ballasts | $1,342 | $990 | |
| GT0798 #02 Y:2004 | 02 | 2004 | Utilize higher efficiency lamps and/or ballasts | $3,418 | $2,172 | |
| GT0798 #01 Y:2004 | 01 | 2004 | Utilize higher efficiency lamps and/or ballasts | $7,607 | $4,928 | |
| SD0335 #05 Y:2003 | 05 | 2003 | Redesign process | $12,125 | $8,000 |