Assessment Year | 2004 |
---|---|
Principal Product | metal hoses, tubes |
NAICS | 335210: Small Electrical Appliance Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
29,000
ft2
|
Annual Production | 200,000
thousand feet
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,953 | 1,153,610 |
kWh
|
$0.12 |
Electricity Demand | $24,253 | 4,690 |
kW-mo/yr
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,645 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,982 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,899 | $8,001 |
$2,377
21,000
kWh
|
$522
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,194 | $80 |
$1,039
7,500
kWh
|
$155
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $857 | - |
$736
5,207
kWh
|
$121
-
kW-mo/yr
|
- | - | |
04 | 3.5132: Reuse rich white water in other applications | $10,570 | $14,000 |
$10,430
88,471
kWh
|
- |
$140
-
Tgal
|
- | |
05 | 2.5194: Redesign process | $12,125 | $8,000 | - | - | - | $12,125 | |
TOTAL RECOMMENDED | $27,645 | $30,081 |
$14,582
122,178
kWh
|
$798
-
kW-mo/yr
|
$140
-
Tgal
|
$12,125 | ||
TOTAL IMPLEMENTED | $12,982 | $8,000 |
$736
5,207
kWh
|
$121
-
kW-mo/yr
|
- | $12,125 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs