ITAC Assessment: UF0439
ITAC logo
ITAC Assessment: UF0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product pens
NAICS 339940: Office Supplies (except Paper) Manufacturing
SIC 3951: Pens, Mechanical Pencils, and Parts
Sales Range $10
M
to 50
M
# of Employees 351
Plant Area 91,000
ft2
Annual Production 290,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $570,411 5,602,000
kWh
Electricity Demand $57,901 12,020
kW-mo/yr
Natural Gas $4,341 344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $217,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,274

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7229: Air condition only space necessary $5,313 $20,000 $5,313
47,434
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,289 $5,193 $1,289
12,636
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $17,474 $5,800 $17,474
156,024
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,430 $4,040 $15,430
137,771
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $1,264 $2,760 $1,264
11,283
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,983 $11,500 $6,983
64,296
kWh
-
07 2.4227: Use compressor air filters $1,555 $847 $1,555
15,249
kWh
-
08 2.4224: Upgrade controls on compressors $8,617 $500 $8,617
76,937
kWh
-
09 2.4226: Use / purchase optimum sized compressor $11,007 $375 $8,683
85,132
kWh
$2,324
-
kW-mo/yr
10 2.4221: Install compressor air intakes in coolest locations $1,063 $816 $1,063
10,409
kWh
-
11 2.1131: Repair faulty insulation in furnaces, boilers, etc $140,596 $3,840 $140,596
1,377,040
kWh
-
12 2.7446: Utilize sensors controlling roof and wall openings $7,249 $4,555 $7,249
71,070
kWh
-
TOTAL RECOMMENDED $217,840 $60,226 $215,516
2,065,281
kWh
$2,324
-
kW-mo/yr
TOTAL IMPLEMENTED $18,274 $10,080 $18,274
165,656
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs