Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

255

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electric lighting equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2503 #08 Y:2025 Install occupancy sensors $751 $435
UC2503 #07 Y:2025 Install timers and/or thermostats $531 $2,870
UC2503 #06 Y:2025 Use / purchase optimum sized compressor $15,917 $51,000
UC2503 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $16,078 $1,600
UC2503 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,976 $75
UC2503 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,369 $18,244
UC2503 #02 Y:2025 Change rate schedules or other changes in utility service $3,774 -
UC2503 #01 Y:2025 Pay utility bills on time $115 -
CI0037 #14 Y:2024 Use most efficient type of electric motors $1,215 $740
CI0037 #13 Y:2024 Use / purchase optimum sized compressor $2,023 $18,000
CI0037 #12 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,140 $860
CI0037 #11 Y:2024 Use photocell controls $2,356 $960
CI0037 #10 Y:2024 Replace fossil fuel equipment with electrical equipment $2,495 $36,000
CI0037 #09 Y:2024 Install occupancy sensors $3,616 $1,575
CI0037 #08 Y:2024 Recharge batteries on during off-peak demand periods $4,373 $50
CI0037 #07 Y:2024 Convert to high volume low pressure (hvlp) paint guns $4,500 $2,000
CI0037 #06 Y:2024 Recover and reuse waste material $7,648 $8,750
CI0037 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,720 $13,500
CI0037 #04 Y:2024 Insulate bare equipment $11,559 $3,600
CI0037 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $20,579 $1,600