| Assessment Year | 2026 |
|---|---|
| Principal Product | customized LED lighting systems |
| NAICS | 335110: Electric Lamp Bulb and Part Manufacturing |
| SIC | 3641: Electric Lamp Bulbs and Tubes |
| Sales Range | $100 M to 500M |
| # of Employees | 240 |
| Plant Area |
142,000
ft2
|
| Annual Production | 1,400
thousand feet
|
| Production Hrs. Annual | 3,125
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $244,996 | 614,325 |
kWh
|
$0.40 |
| Electricity Demand | $36,167 | 2,508 |
kW-mo/yr
|
$14.42 |
| TOTAL YEARLY COSTS | $281,163 | |||
| RECOMMENDED SAVINGS* | $58,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $31,834 | $2,250 |
$31,834
79,825
kWh
|
- | - | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $496 | $160 |
$181
454
kWh
|
$315
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.3132: Recharge batteries on during off-peak demand periods | $2,835 | $4,194 | - | - | $2,835 | - | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $13,854 | $29,876 |
$13,854
34,740
kWh
|
- | - | - | - | |
| 05 | 2.7135: Install occupancy sensors | $860 | $2,740 |
$750
1,880
kWh
|
- | - | $4 | $106 | |
| 06 | 2.7291: Reschedule and rearrange multiple-source heating systems | $8,542 | $50,720 |
$8,542
21,420
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $58,421 | $89,940 |
$55,161
138,319
kWh
|
$315
-
kW-mo/yr
|
$2,835 | $4 | $106 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs